Fall trade show season is the busiest stretch of the year. Between late September and early December, there are more than a dozen major shows across Las Vegas, Orlando, Chicago, and other convention cities. Every year, exhibitors contact us the week before their show asking if we can still get them a display in time. The answer is usually yes, but what you can get depends on when you order. At Displayit, we manufacture and print every trade show display in-house at our Buford, GA facility. We do not outsource printing. We do not wait on third-party vendors. That is why we can hit deadlines that other companies cannot.
Fall 2026 order cutoff dates by show
The table below shows the last day to place a standard-production order for each product type and still receive it before the show opens. Dates assume standard ground shipping from Buford, GA and artwork approved at the time of order. Rush production and expedited shipping are available beyond these dates on a case-by-case basis. Contact our team for rush timelines.
| Show | Dates | City | Banner Stand | Backwall | Full Kit |
|---|---|---|---|---|---|
| NACS Show | Oct 7-9 | Las Vegas | Sep 25 | Rush only | Rush only |
| IMEX America | Oct 13-15 | Las Vegas | Oct 1 | Sep 29 | Sep 26 |
| Money20/20 | Oct 18-21 | Las Vegas | Oct 6 | Oct 2 | Oct 1 |
| Pack Expo | Oct 20-23 | Chicago | Oct 9 | Oct 7 | Oct 6 |
| SupplySide West | Oct 26-30 | Las Vegas | Oct 14 | Oct 12 | Oct 9 |
| SEMA Show | Nov 3-6 | Las Vegas | Oct 22 | Oct 20 | Oct 17 |
| IAAPA Expo | Nov 16-19 | Orlando | Nov 6 | Nov 4 | Nov 3 |
| MJBizCon | Dec 1-4 | Las Vegas | Nov 19 | Nov 17 | Nov 14 |
Your show not on this list? The same math applies to any event in any city. Check ground shipping days from Buford, GA to your convention city in our Shipping Times to Every Major U.S. Convention City guide, then add 4-7 business days for production. Count backward from your show date and that is your order deadline.
What you can get based on how much time you have
Click any timeline below to see exactly what you can order and receive.
My show is in 3 days or less
What is possible: Rush production (24-48 hours) with overnight or 2-day shipping. This is handled case by case. Call us immediately at the number on our contact page. Do not place an online order for a rush this tight. Speak to someone first.
Best options: A retractable banner stand is the fastest product to produce and ship. A branded table cover is second. Both can be produced in 1-2 days under rush conditions.
What you need ready: Print-ready artwork files at the time of the call. Rush production cannot start until artwork is approved. Every hour of artwork revision delays the ship date.
My show is in 1 week
What you can get: A retractable banner stand + branded table cover. This is the core conference setup and the fastest full package Displayit offers. Standard production is 4-5 business days for banner stands. Add 2-3 days for ground shipping to most convention cities, or 1-2 days for rush shipping.
Total cost: $375 to $625 for a complete branded presence at your booth. For sizing help, see: What Size Banner Stand Do I Need?
My show is in 2 weeks
What you can get: A full 10x10 booth setup. A 10ft backwall display takes 5-6 business days for standard production. Add your banner stand and table cover and you have a professional booth with full branding on all surfaces. Two weeks is enough time for standard production and standard ground shipping to any U.S. convention city.
Total cost: $1,200 to $1,800 for a backwall + banner stand + table cover. For layout ideas, see: 10x10 Trade Show Booth Ideas by Budget.
My show is in 3 to 4 weeks
What you can get: Everything. Backlit displays, multi-frame kits, 10x20 booth configurations, full booth packages with counters, banner stands, and table covers. Three to four weeks gives you the full product catalog with standard production and standard ground shipping. No rush fees needed.
Total cost: $2,200 to $10,000+ depending on booth size and whether you add lighting. For a personalized recommendation, try: Trade Show Display Buying Guide.
What products ship fastest
| Product | Standard Production | Rush Production | Ships As |
|---|---|---|---|
| Banner Stands | 4-5 business days | 1-2 business days | Carry bag, fits in overhead bin |
| Table Covers | 4-5 business days | 1-2 business days | Small box, ships UPS/FedEx |
| Backwalls | 5-6 business days | 2-3 business days | Rolling case or duffel |
| Pop Up Displays | 5-7 business days | 2-3 business days | Shipping case |
| Backlit Displays | 6-8 business days | 3-4 business days | Shipping case |
| Multi-Frame Kits | 6-8 business days | 3-4 business days | Multiple shipping cases |
| Replacement Graphics Only | 3-4 business days | 1-2 business days | Rolled in tube or folded in box |

Why Displayit can move faster than most competitors: We design, print, and assemble every display in our own facility in Buford, GA using G7 Certified dye-sublimation equipment. When you place a rush order, our production team starts printing within hours, not days. We do not send your files to a third-party printer and wait for their queue. That is the difference between a company that manufactures displays and a company that resells them.
The fastest way to order for a deadline
- Have your artwork ready. Production time starts after artwork approval. If you need design help, our team can assist, but every round of revisions pushes the ship date. Displayit provides free design templates for every product on each product page.
- Know your show date and venue city. We calculate backward from your show date to confirm what is achievable.
- Call or submit a consultation request. For any order within 10 business days of your show, talking to our team directly is faster than placing an online order. Schedule a consultation or call us from the Displayit contact page.
- Approve the proof immediately. We send a digital proof before printing. The faster you approve, the faster we print.
Already have a display? You might only need new graphics.
If your hardware is in good condition but your branding is outdated, replacement graphics are the fastest and most affordable option. A new graphic for an existing frame takes 3-4 business days for standard production and 1-2 days for rush. No new hardware to ship. For a deeper look at when to replace graphics vs. buy new hardware, see: Old vs New Trade Show Displays: A Weight, Setup, and Cost Analysis.
Frequently asked questions
Every Displayit display includes custom-printed graphics, hardware, and a carry bag or shipping case. For questions about what you can still get in time for your fall show, talk to our team.
About the Author
Adam Chait is the CEO of Displayit, a U.S. based trade show display manufacturer that has been helping companies exhibit with confidence since 1996. Displayit designs, prints, and ships custom trade show displays from its facility in Buford, GA, serving thousands of exhibitors across every major industry. Adam leads a team of display specialists who work directly with exhibitors to match the right booth solution to their space, timeline, and budget. For personalized guidance, schedule a free consultation with the Displayit team.